
Simulate the Full EV Charging StackBefore Deploying Hardware
The only platform that connects OCPP protocol testing, smart charging validation, and energy cost modeling in one place. Cut QA cycles from weeks to hours and de-risk every site deployment.
$7B+
CSMS Market by 2030
100+
CSMS Vendors Need Testing
10x
Faster QA Cycles
$5B
NEVI Funding at Stake
The Problem
EV charging is getting too complex to test in the field
The industry is moving faster than traditional QA can keep up. Regulations, protocols, and grid complexity are compounding — and failures in the field cost millions.
NEVI Compliance Pressure
$5 billion in federal funding requires OCPP 2.0.1, OCPI 2.2.1, and ISO 15118 compliance. Testing against every requirement with physical hardware is slow, expensive, and error-prone.
Validate compliance in software before your certification deadline.
Smart Charging Complexity
Modern algorithms must handle TOU rates, demand charges, demand response events, V2G, solar integration, and battery storage simultaneously. Testing in production is risky.
Benchmark algorithms against real grid constraints in a safe sandbox.
Costly Grid Over-Build
Fleet depots and charging sites routinely spend $50K-$500K on grid planning. Many still rely on spreadsheets, leading to over-sized infrastructure or unexpected demand charges.
Model energy costs and right-size your infrastructure before capital commitment.
Interoperability Nightmares
100+ charger OEMs, dozens of CSMS vendors, multiple protocol versions. Every new combination needs testing, and vendor-specific quirks break integrations in the field.
Test every charger-CSMS combination virtually, at scale, in CI/CD.
Three Products, One Platform
Cover the full lifecycle of charging infrastructure
No other vendor combines protocol testing, energy simulation, and digital twin capabilities. ChargerTwin connects what the industry has kept fragmented.
GridTestPro
Protocol Simulation & Testing
Cloud-based OCPP and ISO 15118 simulation that replaces physical test labs. Spin up thousands of virtual charge points and run your full QA suite in minutes, not weeks.
Built for CSMS vendors and charger OEMs
- OCPP 1.6, 2.0.1 & 2.1 protocol testing
- ISO 15118 Plug & Charge simulation
- NEVI compliance pre-check automation
- Smart charging scenario engine
- Realistic EV battery & SoC models
- CI/CD native (GitHub Actions, GitLab CI)
SiteSimulator
Energy Cost Modeling
Model your charging site economics before committing capital. Compare utility rates, optimize demand charges, and calculate the ROI of battery storage and solar co-location.
Built for CPOs and fleet operators
- North American utility rate database
- Demand charge & TOU optimization
- BESS + solar co-simulation
- Location-based EV traffic modeling
- Side-by-side scenario comparison
- Investor-ready financial reports
SiteTwin
Full-Stack Digital Twin
The product no one else offers. Simulate the complete journey from EV plug-in through ISO 15118 handshake, OCPP messaging, smart charging decisions, and grid impact in one continuous flow.
Built for large operators and OEMs
- End-to-end session simulation
- Smart charging algorithm benchmarking
- V2G economic modeling with market data
- OpenADR demand response testing
- Multi-site portfolio optimization
- Custom SLA & dedicated support
Standards & Compliance
OCPP 2.1
Full protocol support
ISO 15118-20
Plug & Charge + V2G
OCPI 2.2.1
Roaming interop
NEVI Compliant
Pre-check automation
CI/CD Native
GitHub & GitLab
SOC 2 Ready
Enterprise security
Who It's For
Purpose-built for every player in the EV charging ecosystem
Whether you're building the software, deploying the hardware, or operating the network — ChargerTwin accelerates your path to production.
CSMS Vendors
Need to test OCPP 2.0.1 compliance and multi-vendor charger compatibility before shipping
Replace physical test labs. Cut QA cycles from weeks to hours.
Charge Point Operators
Need to model energy costs and validate configs before site deployment
Save $50K-$500K in avoided grid overbuild per site.
Fleet Operators
Electrifying depots is complex — need to right-size grid, chargers, and schedules
One platform replaces multiple consultants and spreadsheets.
Charger OEMs
Need to test firmware OCPP compliance against multiple CSMS backends
Accelerate certification and reduce field failures.
Pricing
Invest a fraction of what a single site costs to deploy
A simulation that saves you from one grid overbuild pays for itself many times over. Start free, scale as your network grows.
Free Trial
Explore the platform risk-free. No credit card required.
Get hands-on in minutes
- 10 virtual charge points
- 1 team member
- 10 simulations
- OCPP 1.6 testing
- Basic energy cost modeling
Starter
For small CPOs and early-stage testing teams.
Get started with protocol testing basics
- Up to 50 virtual charge points
- 3 team members
- 100 simulations/month
- OCPP 1.6 & 2.0.1 testing
- Basic energy cost modeling
- Email support
Professional
For CSMS vendors and growing operators who need full protocol coverage.
Most popular for CSMS certification
- Up to 500 virtual charge points
- 15 team members
- 1,000 simulations/month
- OCPP 2.1 + ISO 15118 testing
- Smart charging benchmarks
- Full energy modeling (BESS + Solar)
- CI/CD & API access
- Priority support
Start with a 3-day free trial. No credit card required. Upgrade anytime.
Stop testing in the field.
Start simulating in the cloud.
Join the CSMS vendors, CPOs, and fleet operators who are cutting QA cycles, avoiding costly grid overbuild, and shipping faster with ChargerTwin.
14-day free trial · No credit card required · Cancel anytime